Management System Familiarisation CBT

Management System Familiarisation Computer Based Training

The Company MS Familiarisation CBT is a software package designed to train your staff and crew members in the structure and contents of your company’s management system. The CBT is company specific and contains a presentation section, a controlled documentation structure section and an administration section.

 

The CBT is typically divided into 10 chapters. These are:

  • Chapter 01: Introduction to the company MS and Mission Statement
  • Chapter 02: Historic View of Ship Management Systems
  • Chapter 03: Controlled Documentation Structure
  • Chapter 04: 1st Level of Documentation
  • Chapter 05: 2nd Level of Documentation
  • Chapter 06: 3rd Level of Documentation
  • Chapter 07: Emergency Response
  • Chapter 08: Continual Improvement
  • Chapter 09: Reporting and Filing System
  • Chapter 10: Responsibilities, Authorities and Accountabilities

 

Chapters Contents Description

 

Chapter 01

Chapter 1: Introduction to the Company Management System & Mission Statement is an introduction to the CBT and the Company’s Mission Statement. It includes pages about the Company’s Mission Statement, Aspirations and Goals and CBT coverage.

 

Chapter 02

Chapter 2: Historic View of Ship Management Systems includes a recap of the last ten years in the Codes and Standards developed. The 2nd Chapter includes pages about ISM, ISO 9001, ISO 14001, TMSA and heir incorporation in the MS of the Company.

 

Chapter 03

Chapter 3: Controlled Documentation Structure includes a description of the levels of the Company MS and a sample mention of the most important manuals.

 

Chapter 04

Chapter 4: 1st Level of Documentation describes the 1st level manual(s) of the company. It contains a brief introduction of the manual(s) and one or more menu pages with the summaries of the manual(s)’s sections by section (e.g. policies)

 

Chapter 05

Chapter 5: 2nd  Level of Documentation describes the 2nd  level manual(s) of the company. It contains a brief introduction of the manual(s) and one or more menu pages with the summaries of the manual(s)’s sections by section (e.g. procedures)

 

Chapter 06

Chapter 6: 3rd Level of Documentation describes the 3rd level manual(s) of the company. It contains a brief introduction of the manual(s) and one or more menu pages with the summaries of the manual(s)’s sections by section.

 

Chapter 07

Chapter 7: Emergency Response includes a series of pages about the contingency plans and manuals of the company. These include information about damage stability and  support services. In this chapter the contingency manuals such as SOPEP, VRP and others are summarised.

 

Chapter 08

Chapter 8: Continual Improvement Cycle includes a description of the process of Continual Improvement in the Company’s MS including the Company Targets and Objectives.

 

Chapter 09

Chapter 9: Reporting & Filing System describes the Company’s main registry form.

 

Chapter 10

Chapter 10: Responsibilities, Authorities & Accountabilities lists the ranks of the company’s sea farers including extracts of the company’s manuals of their responsibilities.

 

The user at any time may take the examination which consists of 20 randomly generated questions out of a pool of about 80 total questions.  The exam is based on the contents of the CBT’s presentation and covers all chapters from 1 to 8.

 

The pass/fail percentage is of the exam is 75% or 15 right answers out of 20. 

 

When the user passes the examination, the certification attestation button is enabled in the “View User” button of the administration panel, so the user may ask the administrator to print a certification attestation.

 

Be aware that only the last examination score is saved in the user’s current record. (Previous results can be seen in the records section of the View User screen where the previous tests can be seen).

 

Technologies Used

Microsoft .NET 4.0, XVid Video Codec, MP3, DirectX, GDI+, DirectX 9.0

 

System Specification

CPU Intel or AMD 1.5GHz, 1Gb RAM, 600MB free disk space, 40x CD-ROM, Sound Card, Windows XP, Windows XP64, Windows Vista, Windows 7, Windows 8

 

Activation

This software is protected against unauthorized copying. Each CBT copy produces a serial key unique for every PC and requires an activation key in order for the software to operate. The first time you run the program, you will be presented with a window that provides you with a serial number. You will have to provide TQC with that serial in order to obtain an activation code. You can either send it via e-mail at cbt@tqc.gr, or telephone (the company's contact details are written in the activation window). You have to complete the installation and activation procedure as a windows administrator. When you receive the activation key from TQC, type it in the appropriate space, and the software activation will be complete. The activation is a one time procedure for each PC. After the activation the software will run normally. Each CD provided is licensed for one activation only.